*** SEVERE ERROR
THE FOLLOWING STAGES DRIED UP (VAPOR OR LIQUID FLOW APPROACHES 0):
8 14
A LIMIT OF 0.10000E-04 * SUM OF FEEDS WAS IMPOSED ON THE FLOW RATES
OR A LIMIT OF 0.10000E-04 WAS IMPOSED ON THE STAGE V/L OR L/V RATIO.
INFORMATION
CALCULATED REBOILER DUTY IS NEGATIVE.
** ERROR
BLOCK B2 IS NOT IN MASS BALANCE:
MASS INLET FLOW = 0.10926920E+01, MASS OUTLET FLOW = 0.10458912E+01
RELATIVE DIFFERENCE = 0.44747334E-01