- 积分
- 81
- 注册时间
- 2011-4-24
- 积分
- 81
 
|
edr警告提示如下:
警告1,Definition | Application Options for
stream 2 indicates that the stream is a single phase. If properties have been generated using
Aspen Properties or BJAC, they are obtained for that single phase even if the package would
have otherwise returned properties for other phases.
警告2,A default allocation of Hot stream 1: to the shellside has been made. It is estimated that
the chances of this being correct are about 50 percent. Potentially important factors, such as
a fluid being hazardous, or having material compatibility problems, could not be allowed
for. Such fluids would usually go on the tubeside.
有知道的朋友吗,麻烦告知一下该如何消除,先谢谢了!
|
|