- 积分
- 15
- 注册时间
- 2017-7-8
- 积分
- 15
![Rank: 4](static/image/common/star_level3.gif)
|
The following Unit Operation blocks were
completed with warnings:
B13
The following Convergence blocks were
completed with warnings:
$OLVER01
The following messages were issued during Input Translation:
INFORMATION
THERE ARE HENRY COMPONENTS DEFINED IN THIS CASE, THE BINARY DATABANK
WILL BE SEARCHED AUTOMATICALLY FOR ANY AVAILABLE HENRY CONSTANTS.
INFORMATION IN PHYSICAL PROPERTY SYSTEM
THE PAIR PARAMETERS FOR ELECNRTL OPTION SET HAS BEEN RETRIEVED FROM
DATABANK ENRTL-RK.
INFORMATION
PURE COMPONENT PARAMETERS FOR SOME COMPONENTS ARE RETRIEVED FROM
DATABANK ELECPURE. THESE PARAMETERS ARE USED WITH ELECNRTL METHOD.
UNLESS YOU ENTER YOUR OWN PARAMETERS IN PROP-DATA PARAGRAPHS.
PARAMETER PLXANT RETRIEVED FOR COMPONENT H2O
PARAMETER CPAQ0 RETRIEVED FOR COMPONENT HSO4-
PARAMETER THRSWT(ELEMENT/3) RETRIEVED FOR COMPONENT H2O
PARAMETER VLBROC RETRIEVED FOR COMPONENT NH3
PARAMETER CPAQ0 RETRIEVED FOR COMPONENT SO4--
循环泵的警告
* WARNING
FLASH CALCULATIONS FAILED TO CONVERGE IN 30 ITERATIONS. VAPOR PRESSURE
CALCULATION FAILED TO CONVERGE. NPSH AVAILABLE IS UNRELIABLE.
- INFORMATION
NET POSITIVE SUCTION HEAD IS LESS THAN ZERO
|
|